ÉTSGRIDDCCPS
INNOVER ENSEMBLE 7

A Method for Mapping Multi-Source Building Data in Digital Twins

27 November 2026
Mohammad Bigdeli
Mohammad BigdeliMaster's student
Prof. Ali MotamediSupervisor
The problem

Building information is held in four separate systems

BIM

what was built

BAS / BMS

how it runs, live

CMMS / CAFM

how it is maintained

O&M documents

how to fix it

Objective: an automated recommender system for cross-domain data integration
and semantic mapping in digital twins.
Approach

From a laboratory prototype to a mapping method

step 01

GRIDD laboratory

30
data points mapped to the model
manual mapping
Data sources
Lab sensorsBIM
step 02

Pavillon F

450+
data points mapped to the model
building-specific rules
Data sources
BMSBIM
Scope
PartialAir terminalsRoom sensors
Step 01 · GRIDD laboratory

GRIDD laboratory digital twin

GRIDD|GRIDD Digital Twin–average6sensor boxes30data pointsdemo values
last 24 h
Step 01 · Architecture

GRIDD laboratory: system architecture

Step 02 · Pavillon F

Pavillon F, an ÉTS campus building

140+
rooms on the model
450+
live data points
5 min
polling interval
Existing building sensors, read from enteliWEB
Step 02 · Architecture

Pavillon F: system architecture

Step 02 · Technology stack

Technology stack

Step 03 · The mapping problem

The point mapping problem

Building automation system · enteliWEB

F_1082_T_PIE · analog input 1001 · controller 61102
45,852 records30,304 relate to the model: controllers, points and their logs
?

BIM model

61102.LNK1001 · thermostat · room F-1082
151,046 elements638 relate to the building system: rooms, HVAC equipment, control devices
The same thermostat has a different name in each source, and the two share no common identifier.
Step 03 · The method

An eight-stage mapping method with expert review

Input

Data sources

BMS export and BIM model

1 Explore2 Scope
AI-based mapping

Candidate links

The model infers links, tests each rule on the data and gives a confidence level

3 Semantics4 Rules5 Discover
Automated

Consistency check

All links checked together for conflicts

6 Consistency
Expert in the loop

Review

Uncertain links are settled with evidence; the remainder goes to a person

7 Review
Output

Link registry

Every link with its relation, confidence and evidence

8 Export
Step 03 · Example

Example: room F-1082

Room F-1082temperature pointthermostatfan coil 01-VC-607air terminal 01-VAV-622
Step 03 · Results

Mapping results on Pavillon F

15,765
points mapped
174
controllers
470
model elements linked
53 min
one automated run
23,343
links between the building system and the model
Links, by relation
brick:isPointOf15,878
brick:hasLocation6,968
related_to318
brick:controls152
owl:sameAs18
brick:feeds9
Building system45,852 records→15,765 points and 174 controllers mapped
BIM model151,046 elements→470 elements linked
Applications

Applications of the mapped data

Capability 01 / 10 · Room conditions

Room temperature

GRIDD|Pavillon F–average room temperature–rooms need attention–building powerdemo values
last 24 h
Future work

From a digital shadow to a digital twin

before

Digital model

A 3D model, updated by hand.

building  ┄  model
today

Digital shadow

The building updates the twin's live data every five minutes.

building  ━━▶  model
  • Building system
  • Work orders
  • O&M documents
One integration layer
  • Space & occupancy
  • Energy meters
  • Role-based views
ÉTSGRIDDCCPS
INNOVER ENSEMBLE 7

Thank you!

Questions?
in
linkedin.com/in/mobigdeli
Mohammad BigdeliMaster's student
Prof. Ali MotamediSupervisor
00:00
Rotate your phone to landscape
Presenter mode
loading the 3D models…
→next   ←back   or the two arrows, bottom right
dragrotate the model   wheelzoom
clickpanels, tabs and rooms are live
Ffullscreen   Ncue notes   Treset timer